Batch-to-batch variation is controlled within approx. ±2% with SPC and a test report per batch; stricter limits can be agreed in the technical agreement.
Yes, but avoidable by grade selection: SH (~150 °C), UH (~180 °C), EH (~200 °C), AH (up to 220 °C), recommended by your L/D and circuit, with high-temperature aging verification if needed.
No: samples and mass production run on the same line and standard, with first-article approval and key parameters benchmarked against the sample.
Visual inspection, XRF coating measurement, salt-spray testing (24–500 h) and dimensional checks, with batch traceability; tightened sampling for critical parts.
Yes: test reports per batch; re-inspection by you or SGS/TÜV is supported, in your preferred format.
8D process: response in 24–48 h, root-cause analysis, corrective action and verification; replacement or compensation where the cause is ours.
Samples ~15 days, production ~35 days; material and capacity confirmed before scheduling, with early warning and alternatives.
Yes. MOQ from ~10 kg, samples in ~15 days; small and medium batches are our strength.
We can evaluate; we commit only what capacity allows, and we keep commitments.
~8,000 t annual capacity, integrated processes and four bases; safety stock can be reserved by agreement.
Annual frameworks with staged price locking and quarterly adjustments; HRE-free and CeFeB options reduce dependence on Pr/Nd/Dy/Tb.
CeFeB cuts critical rare-earth usage by ~30–50% at up to ~54 MGOe; HRE-free grades avoid heavy-rare-earth price and compliance risk.
None: quotations are itemized by grade, size, coating, quantity and lead time.
Higher, but tiered pricing with the cost drivers explained, so you know how much it drops at volume.
JLMAGNET follows Chinese law and the latest announcements for export licensing, with a dedicated compliance process. We never promise "no licence required", but we deliver what is legally possible.
Yes: composition and compliance declarations plus test data on request; carbon-footprint data within an agreed scope.
Yes: ~40% export, mainly Europe/North America; regular exhibitor at CWIEME Berlin and Coiltech Italia.
Yes, certificates of origin and other export documents as required.
Yes: give us the working conditions and we propose 2–3 options with trade-offs.
Normally ~15 days; faster for simple shapes or existing tooling.
Direct engineer contact: routine within one working day, urgent same day, on-site/video analysis for major issues.
We serve EV motors, wind power, industrial motors, appliances, consumer electronics, robot joints and acoustics.
Three verifiable layers: certifications with per-batch reports; factory/third-party audits welcome; start with a trial order.
Welcome: system and process audits (lines, testing, traceability, change management) plus third-party audits.
We compete on fit, not size: HRE-free & GBD capability, CeFeB cost-down, complex shapes and assemblies, 15-day samples / 35-day production, small orders accepted.